How does CPV compare to CSP?

CPV requires far less water, and is less disruptive to the land than CSP. In fact, CPV requires no water in operation, and only minimal water for routine cleaning. In addition, CSP installations must be large – 100MW or larger – and deployment time is lengthy and projects are difficult to permit and finance.
 

copyright

Copyright 2012 Amonix Inc. All rights reserved.
Amonix, Inc. • 1709 Apollo Court, Seal Beach, CA 90740 USA • 562.200.7700